Full rewiring & new installations
We design and execute complete electrical installations in new builds and renovations, compliant with Portuguese regulations and sized for today's loads: AC, induction, EV.

About the service
A new installation is the chance to get everything right first time: dedicated circuits for high-power equipment, sockets where real life wants them (not where the builder saved money), logically switched lighting and a panel with room to grow.
We design the layout with you room by room before opening a single chase. Then we execute with conduit, per-circuit sized cables and accessible junction boxes - and photograph everything before closing, so in ten years any technician knows where every cable runs.
What's included
Installation design & schematics
Room-by-room planning of sockets, lighting and circuits, approved with you before execution.
Chasing & complete cabling
Embedded conduit, per-circuit cabling and chases closed ready for paint.
Dedicated power circuits
Separate lines for AC, oven, induction hob, appliances and water heater - no more tripping breakers.
Certification & grid connection
Preparation for inspection, certification follow-through and coordination with the supplier.
What you get in the end
A certifiable installation sized for decades, with a labelled panel and a photo dossier of everything inside the walls.
How we work
Diagnosis & measurements
We assess the existing installation, contracted power and what you want to run in future.
Sized proposal
Circuits, cable sections and protections calculated for real loads - not guesswork.
Clean execution
Chases closed, cables identified and a tidy panel with readable labels.
Testing & handover
Insulation measurements and RCDs tested in front of you, with the diagram handed over at the end.
Frequently asked questions
How long does rewiring a 2-bed flat take?+
The cabling itself takes 4-6 working days; with chases closed and fittings installed, allow 2 weeks within a renovation. In an occupied home we work zone by zone so you never sleep without power.
What contracted power should I have?+
It depends on the equipment: a home with induction, AC and an EV usually justifies 10.35 kVA or dynamic load management. We calculate based on what you'll actually run simultaneously.
Do you also install network and TV?+
Yes - we use the same chases to run Cat 6 network and coax cable, leaving wired internet points where they're needed.
Ready to start your project?
Send us a message with photos of what you need and we reply with an indicative quote within 24-48h. Easy payment: MB WAY, Revolut, Wise, bank transfer or Visa card.
Mon-Fri, 8am-10pm
