Layout changes & partitions

We transform your floor plan: opening up spaces, creating new rooms and optimising every square metre, with care for structure and existing utilities.

Layout changes & partitions

About the service

Changing a floor plan is the most effective way to add value: an open kitchen, an en-suite with a walk-in closet or a second bathroom completely change how a space lives. Before any demolition we check what is structural, where water and electricity run and what the condominium rules say.

We execute the full change: clean demolition, new partition in drywall or masonry, utility adaptation, finishes and painting. At the end, the change is documented with photos of the infrastructure before the walls are closed.

What's included

Controlled wall removal

Prior structural check, clean cutting, protection of the rest of the home and same-day debris removal.

New drywall or masonry partitions

Straight, sound-insulated walls ready for paint, with reinforcements for TVs, shelves or wall-hung furniture.

Open kitchens & open-plan living

Kitchen-living integration with flooring, lighting and extraction planned from scratch.

Utilities adapted to the new layout

We move water points, drainage, sockets and lighting to where the new plan needs them.

What you get in the end

A floor plan that fits your life - more light, better flow and every square metre used - with all utilities adapted and finishes complete.

How we work

01

Visit & survey

We measure the space, check existing utilities and listen to what you want to change.

02

Fixed quote

An itemised proposal by stage and material, with a fixed deadline and final price.

03

Staged works

Demolition, utilities, drywall, tiling, painting - each phase approved before the next.

04

Clean handover

Final touch-ups and professional cleaning at key handover.

Frequently asked questions

How do I know if a wall is structural?+

Don't rely on guesses: we assess on site the thickness, material and position of the wall in the building structure, and when in doubt we consult the as-built drawings or an engineer.

Do I need a permit to remove a wall?+

Interior changes that don't touch the structure usually require only a prior notification to the town hall. We handle the paperwork when needed.

How long does a layout change take?+

A simple change (one wall, no utilities) takes 3-5 days; with water and electrical adaptation, typically 1-2 weeks including finishes.

Ready to start your project?

Send us a message with photos of what you need and we reply with an indicative quote within 24-48h. Easy payment: MB WAY, Revolut, Wise, bank transfer or Visa card.

Mon-Fri, 8am-10pm